So I got the idea to compile a gigantic list of all things my house from one of every home decor bloggers favorite sites Young House Love. Such amazing smart people. This list includes all the things I have done to each room and still want to do and is styled similiarly to the one on YHL. I think it helps me with prioritizing and knowing where to go. I know I've made a lot of lists lately but budget restraints have kept me from really starting any major projects. Hopefully this helps me decide what I can do. :)
Exterior/Porch:
(50% complete)

To-Do:
- Fix step into house
- Remove ramp (it's rotting and collapsing)
- Rebuild steps in back yard
- Pot plants
- Repaint porch
- Grow more grass
- Build new back porch
- Replace exterior doors
- figure out a new carport situation (former roommate drove into a post so it's on it's way out)
- organize sharage (shed+garagey thing=sharage)
- add more motion sensor/security lighting
- new gutters for the whole house
- enhance privacy in back yard either with new fence or just slats
Done:
- The yard has finally started to grow grass again...
- Repainted the lawn furniture
- Got a grill and lots of pots.
Entryway:
(75% complete)
To-Do:
- Maybe get a runner rug somewhere down the line
- Keep updating accesories
- Paint walls
- Paint back of door a fun accent color
Done:
- Replaced the floors in the whole house
- Got a fabulous vintage vanity
- Hung some art
Living Room:
(50%ish complete)
To Do:
If you have seen my recent post about the living room you know the list is pretty long. I say "50%ish complete" because it's fully decorated and pretty I'm just in the market to go Beyonce on that room and "upgrade ya."
Done:
Dining Room:
(20%ish complete)
To-Do:
This is sort of the same deal as the living room. I want to upgrade the dining area and make it more "my style" within the next year or so. Right now I have the same furniture in there I've had since I was 18. So it's totally done remodel wise.
- Buy new table (this one from IKEA)
- New chairs that don't have fabric seats
- Jute rug for under table
- Upgrade wall art on "big wall"
- Figure out how the heck to make window wall function/look good.
- Paint walls to go with living room and entryway
- Find a new fabulous light fixture. (sort of feeling a drum shade chandelier)
- paint the ceiling/molding (white o course)
Done:
- love my curtains
- painted the ceiling fan so it works well enough for now
- upgraded flooring through out the house
Kitchen:
(75% completed)
To Do:
- replace painted countertops with a new laminate (love solid surface-but it's a trailer ya'll)
- repaint cabinets with more durable paint (been a year since I've painted em and they chip)
- frame out doors to create shaker style
- replace hardware
- paint ceiling/molding to match rest of living space
- paint behind fridge (hehe)
- frame out wallpaper after new countertops are in
- install new faucet
- get prettier cabinet support sticks
- make bar counter out of wood for a butcher block effect (Like this blogger did here.)
- Make range hood less homely.
Done:
- repainted the hinges/existing hardware
- upgraded dishwasher/fridge to energy efficient
- upgraded art work
Master Bedchamber:
(90% complete)
To-Do:
- upgrade tiny nightstands to small dressers upcycled from thrift store (I have lots of clothes)
- switch living room rug to bedroom and jute rug to dining room
- new headboard/footboard set up
- smaller pillows (brown ones)
- upgrade ceiling fan to pretty light
- paint the molding around bathroom entry, upgrade to prettier trim? maybah?
- upgrade to double rods
- new bedroom door
- replace mini-blinds
Done:
- upgraded all the flooring
- removed crazy scary sliding closet doors
- installed closet organizer
- revamped filing cabinet
- painted ceiling fan so it's prettier for now
- took down uglio I-wish-I-was-French-doors
- put up curtains for closet/bathroom doors
- turned cheapy bookcase into magical shoe display land
- upgraded desk area
- added new/pretty artwork
Master Bathroom:
(95% complete)
To-Do:
- replace/fix shower stall (at least the door, it pops open. Sebastian likes it. I don't.)
- take down cheap over the potty thing and install something prettier (only if there's studs)
- recaulk around the vanities/tubs/shower/wet places.
- upgrade the hardware (just painted the original stuff when I did the redo. heh.)
- add second shelf under little shelf that has been in my trunk for 3 years... no rush yo.
- work around garden tub area to add new tile or something. It's ugly.
- repainted all cabinets in a two tone fashion
- upgraded artwork
- painted the walls and ceilings
- added accessories
- installed jewelry cabinet
- added changing chair
(60% complete)
To-Do:
- Paint the walls to match the living room space
- Paint ceiling/molding
- add beadboard wallpaper from Lowe's to bottom to make it match the living room
- upgrade switch covers
- remove drywall strips and texture
- replace/repaint light fixture
- replace both bedroom and bathroom door and handles
Done:
- added storage using old microwave stand
- upgraded flooring along with the rest of the house
- painted furnace cover (gotta love trailers)
Bedroom #2:
(10% complete)
To-Do:
This is when my unique situation comes into play. Right now in order to afford the mortgage (just graduated college-seeking new full-time job) I rent out bedrooms #2 and #3 for extra cash. Meaning I can't do much in this room. My goal time to "reclaim" this room is by the end of 2014. So a year and a half. This list will read as the future office I want it to be.
- since this will be my office one day, I want to repaint it completely.
- replace bedroom door and knob
- add custom desk with lots of storage. ((sort of like this)
- add more to the existing closet organizer for files/paperwork/craft supplies
- get a wonderful amazing rug
- texture the walls
- upgrade the curtain rod
Done:
- flooring is all replaced with the rest of the house
- upgraded the light switch covers
- new water heater (it's in the closet in there, again, trailer weirdness)
- painted the ceiling and molding
- added closet organizer for max storage space
- took down crazy ugly closet doors and replaced with curtains
Bedroom #3:
(50% complete)
To Do:
Again this is a similiar situation to what's going on with bedroom #2. I rent this room out also because I need help with the mortgage and such. Back in the day it was my office but in the future it will be a guest room. If my life follows it's current path that should be by the end of 2013. Yay!
- upgrade night stand and dresser
- add headboard
- buy a second curtain for the closet (currently has desk on one side, roomie clothes on the other)
- add more shelving to closet organizer so can be used for seasonal shoes/clothes, etc.
- replace bedroom door and knob
- replace mini-blinds
- upgraded all the flooring with rest of the house
- purchased a full-sized guest bed
- upgraded the curtains
- added new curtain rod
- painted magnificent stripes
- already own bedding for future guest
- have a good grey IKEA rug
- have a TV for guest room
- added closet organizer
- upgraded ceiling light
(90% complete)
To-Do:- upgrade to energy efficient white potty (bye-bye bisque)
- add trim under countertop
- replace mirror
- touch up paint
- painted all the walls Dolphin by Home Depot's Martha Stewart collection
- replaced countertop
- replaced faucet
- tiled shower and flooring
- replaced bathtub
- fixed faucet/showerhead
- added storage cabinet
- upgraded light fixtures
- upgraded cabinet handles
- upgraded towel bar
- added new art work (see the reveal for the whole thing here)
(68% complete)
To-Do:
- lighten up the paint color, it's pretty dark
- add tile wallpaper backsplash on space under cabinets
- replace exterior door with an outswing insulated door with dead bolts
- fix electric... :/
- upgrade light fixture
- added microchip pet door for Sebastian (little spendy but I don't want Pouka and Lucy going outside)
- new energy efficient washer/dryer
- build countertop
- added storage for kitty area
- added shelf for storage baskets
- painted ceiling/trim/molding
- painted cabinets
- added cabinet hardware
- upgraded outlet covers
All in all, I have definitely done a lot since I've owned the house. (it'll be 5 years in May. craycray yo.) Some of the things I want to do just are reflective of where I am in my life and upgrading from the free college furniture to stuff that I would like to have for years to come. Some of it is to just keep up with the trends. At this point I think some of my redos are going to be a little sporatic. So for example, replacing furniture might be 6 months to 2 years depending on what I decide to get.
The first five things I do plan on doing are:
- repainting the living room (pretty sure Revere Pewter by BM)
- painting the ceiling in the kitchen/living room/dining room area
- paint laundry room
- upgrade countertops
- replace back exterior door











